Teleos EarthWhat a county gets
The offer, with precedentsSources at foot
A campus the place is better for.
In 2026 counties are not refusing computing. They are refusing to be handled. What follows is what a community is offered when Teleos applies, and the place where each piece is already working.
What the rooms taught.
We read the hearings of 2026. The refusals share a shape: a project announced through land offers to neighbours before a public word; a tenant nobody could name; a first phase sized just under a threshold; wells and low-frequency noise that the ordinance did not measure; and an agreement that asked the county to give up its own powers in return. The approvals share the opposite shape.
| Where | What | How |
|---|---|---|
| Gregg Township, Pennsylvania | A 40 megawatt campus in an existing warehouse, approved 3 to 0 on 27 October 2026 | Eight months of public review; the developer answered residents directly, paid for independent studies, used closed-loop cooling with no well or river water, and accepted 31 conditions on noise, water, emergency response, landscaping and decommissioning |
| Frederick County, Maryland | An approved campus made acceptable to its neighbours | A $110 million community benefits agreement: a school, a community centre, workforce training, $10.5 million for farmland preservation, berms and trails, $5 million of community solar to lower neighbours’ bills; density cut by a fifth and potable water by four fifths |
Two weeks after that agreement the same county refused a second developer offering the same money, because it asked for an eight-year freeze on the county’s zoning in return. The lesson is not to pay more. It is to ask for nothing that takes the county’s power away.
Early, public, named, measured, written, verified. The counties that said yes were offered all six.
Heat for the valley.
A data centre is a heat engine, and the heat is worth something to whoever is next door. In Stockholm, three new facilities at Kista will heat 35,000 apartments, and the operators are paid for the heat. Meta’s campus at Odense feeds Denmark’s largest heat pump into the city network. Fortum’s heat-pump plants outside Helsinki now run on Microsoft’s data-centre heat. In Lévis, Quebec, a campus is designed to warm greenhouses growing 80,000 tonnes of tomatoes a year. In Rjukan, Norway, a data centre warms the world’s largest land-based trout farm, 800 metres away.
What we offer: the campus’s heat piped to named growers, a named fish farm or the nearest town, at the cost of the pipe, for the life of the campus. Near a mill town or a mine, this is the piece that lands first, because it is the one thing a data centre makes that a grower or a town already knows how to use.
Water returned.
Closed-loop cooling, no wells, no river draw, and every gallon metered and capped in the permit are the floor, and they are red line 02. Above the floor: Google now commits to put back more water than its sites consume, 120 per cent by 2030, using reclaimed wastewater where it can. Frederick’s agreement cuts potable use by four fifths through a reclaimed-water system.
What we offer: a campus that consumes no potable water once its reclaimed system runs, and, where a county has a contaminated-well problem, a treatment pilot on the campus for the county’s water. Hydrodynamic cavitation is an established tool in water treatment, strongest for disinfection and several classes of organic contaminant; at the Helmholtz centre in Dresden it has broken down PFOS, a forever chemical, in tap water. Field-scale validation is the open question, and a campus is a good place to answer it.
The land stays farmland.
In Pennsylvania this year an 86-year-old farmer turned down $15.7 million from data-centre developers for 261 acres and sold the development rights to a farmland trust for under $2 million instead: he did not want to see the farms destroyed. Rural communities value their land above $60,000 an acre, and a developer who does not understand that will not be believed about anything else.
What we will not do: build on prime agricultural soil. Teleos sites on brownfield, former industrial and mine land, existing buildings and powered ground already out of agriculture. That rule has one exit, and it is not ours to declare: a campus shown by independent assessors to leave soil, water and people measurably better than it found them, a regenerative node rather than a load. The energy, water and toxicant-recovery work that might make that possible is tracked by the Standard’s inquiry as reported, not proven. Until it is proven, the rule stands.
And one rule with no exit: we will not build in Amish or other Plain-sect farming country, proven technology or not. A people who have kept land, craft and community whole for three centuries are one of this country’s treasures, not a market. A community like that does not need our offer, and we will not make it.
What we offer where we do build: development rights bought through the county’s own farmland trust on a stated multiple of the campus footprint, so that every acre built is matched by acres that can never be. On the campus itself, grazing under the solar, which keeps the ground in agricultural use and, at low densities, supports beneficial insects; and the wetland and woodland the Standard’s regenerative tier asks for, returned on our land.
The bill goes down, not up.
Three mechanisms, each in operation somewhere. A large-load tariff that makes the campus pay for its own capacity: in AEP Ohio territory, 85 per cent of subscribed capacity for up to twelve years. Demand response: Google’s contracts with Indiana Michigan Power and the Tennessee Valley Authority let its campuses shed or shift load at peak, which the utility says lowers costs for all its customers. Community solar paid for by the campus: Frederick’s $5 million project exists to cut one town’s bills.
What we offer: all three, written into the permit. A flexible campus behind a constraint boundary is a grid service, and the county should see that on its own bill.
The quiet campus.
Standard noise ordinances measure in dBA, which is how we hear. The hum that drives people from their homes is low-frequency, measured in dBC, which is how we feel. Lancaster County’s planning guide asks for full-spectrum sound studies before and after construction, and notes that dairy cattle are harmed above 65 to 70 decibels. Red line 01 is 50 decibels at night at the fence.
What we offer: measurement in dBC as well as dBA, before and after, at the property line, continuously and in public; generators sited and screened for low frequency; and barns and horses treated as receptors alongside houses. It is the one promise a neighbour who will never be our customer feels every night.
Our name on the door.
No shell company, no code name, no non-disclosure agreement with any official, and the full build-out declared at the first filing: not 4.99 megawatts of a 50 megawatt plan. And one rule that is ours alone: we ask for a public hearing even where the law does not require one. In unzoned townships, where a developer can build without asking, Teleos asks. It costs a season. It is worth a county.
Every campus then publishes one page a year on the Standard’s registry: power, water, noise, emissions, jobs, payments and complaints, verified by assessors who are not ours. The first scorecard is the second county’s reason to say yes.
A community should be able to point at the greenhouse, the wetland, the quieter night, the lower bill and the trust’s new acres, and say: that is what the computers did here.
Sources
This page summarises research note 07. Named sources: Lancaster County Planning Department, A Planning Guide Pertaining to Data Centers (May 2026); Gregg Township approval (PNK Group release, 29 October 2026); Frederick County, Maryland, community benefits agreement (Maryland Association of Counties, September 2026) and the county executive’s rejection of a second agreement (WYPR, September 2026); Fortune on the Raudabaugh farm (February 2026); Stockholm Data Parks and Green Mountain (Rjukan) on heat reuse; Ramboll on Odense; Fortum (May 2026) on Espoo and Kirkkonummi; The Energy Mix on QScale, Lévis; Google water stewardship (2026); CNR critical review of hydrodynamic cavitation in water treatment (2026) and Helmholtz-Zentrum Dresden-Rossendorf on PFOS (July 2026); Indiana Michigan Power on demand response (August 2025); IEA on Danish community ownership; Scottish good-practice principles for community benefit; Bitcoin Policy Institute, Data Center Dividends; Environmental Research Letters on solar grazing (2026).
Nothing on this page is an offer of securities. Offers to a county are made in its own hearing, in writing, as conditions of approval.