Teleos EarthRed lines

Ten commitmentsConditions of approval

Ten things we will not do, in writing, before the hearing.

On a planning application the site is drawn with a red line. In English a red line is also the limit one will not cross. These are ours, in the numbers counties have already fought for, each with its test and the county that uses it.

Form
Conditions a county can write into the permit
Verified by
Independent assessors, every year, on a public scorecard
Status
Draft, for the founders’ signature.
The view from the property line as a white model: a plain fence and a low hedge in the foreground, a noise monitor on a brass post with a bone dial, a red line running along the ground at the viewer’s feet, and the roofs of data halls far beyond a belt of trees.
Plate 4At the fence. The neighbour’s view: the hedge, the fence, the monitor, the halls behind their trees, and the line at your feet. An illustrative model.

01The ten

The county criteria.

Each has a measurable test and an ordinance precedent. Cleveland, Tennessee’s draft ordinance for an $11.3 billion campus already requires a 60 decibel limit at the property line with continuous monitoring, 75 per cent of directly used power and 90 per cent of process water generated on site with closed-loop cooling, and annual reports on water and power use. We adopt the numbers counties have fought for rather than inventing softer ones.

  1. Red line 01

    Noise at the fence

    At most 50 decibels at night and 60 by day at the property line, continuously monitored, with the data public.

    Precedent: Cleveland, Tennessee; Statesboro, Georgia.

  2. Red line 02

    Water, closed and counted

    Closed-loop cooling. Gallons per megawatt-hour metered and published. A cap written into the permit.

    Precedent: Lancaster, Pennsylvania (20,000 gallons a day); Athens-Clarke County, Georgia.

  3. Red line 03

    No cost to neighbours’ bills

    A signed large-load tariff, or permitted self-supply, before construction begins.

    Precedent: AEP Ohio’s large-load tariff: 85 per cent of subscribed capacity paid for, for up to twelve years.

  4. Red line 04

    Clean power, mostly ours

    At least 75 per cent of directly used power from on-site or contracted additional clean generation. No unpermitted combustion.

    Precedent: Cleveland, Tennessee’s draft ordinance for an $11.3 billion campus.

  5. Red line 05

    Setback and screening

    At least 500 feet from any home. Nothing visible, audible or perceptible beyond the line.

    Precedent: The setback and screening conditions now common in county ordinances.

  6. Red line 06

    No secret deals

    The developer’s identity, the end user’s category and the full community benefit agreement published before the hearing. No non-disclosure agreements with public officials.

    Precedent: The transparency conditions adopted after the Prince William rezoning was voided.

  7. Red line 07

    Generators under rules

    Inventory, fuel, testing hours and emissions permits filed and public.

    Precedent: The Clean Air Act permitting that the Memphis case turns on.

  8. Red line 08

    Decommissioning bond

    A funded restoration plan, approved with the permit.

    Precedent: Standard practice for utility-scale solar and wind, applied to data centres.

  9. Red line 09

    Local benefit, in writing

    A community benefit agreement with numeric commitments, independently verified every year.

    Precedent: The community benefit agreements several counties now require.

  10. Red line 10

    Annual public scorecard

    Power, water, noise, emissions, jobs, payments and complaints, verified by an assessor and published.

    Precedent: Cleveland, Tennessee requires annual reports on water and power use.

02In our own name

And three of our own.

Our name goes on the application. Every filing names Teleos Earth as the developer and names the category of the end user. No shell entities, no code names.

No non-disclosure agreements with public officials, ever. What we say to a planning director we will say at the hearing.

The site follows the county. We choose the jurisdiction first, for its ordinance and its willingness, and offer the Standard’s community section as the basis for conditions of approval. Then we find the land.