Teleos EarthWhere

The siting filterRegions, not sites

Where clean power is wasted and a county is willing.

Four regions pass the filter on today’s evidence. The sites inside them are in the room; the regions, and why, are here.

As of
Rule
The site follows the county.
Status
Draft, for review.
A white model of a ridgeline with wind turbines, a brass transmission line marching away on pylons with one span open at a switch, and below it in the valley a small campus inside its red line, drawing the power by a short brass line from the switch.
Plate 5Stranded power. Wind on the ridge, one span of the line opened at the switch, and in the valley a flexible campus taking the power that would otherwise be thrown away. An illustrative model.

01The regions

Four places where the filter passes.

Curtailed or constrained clean generation within reach; a county that adopted an ordinance rather than a moratorium in the last eighteen months; a large-load tariff or a bring-your-own-capacity rule; water without a river or aquifer draw; a bridge tenant possible.

02Counties

The county comes before the land.

We pick the pilot jurisdiction, not the pilot site: a county that adopted a data-centre ordinance in 2026, Davidson County in North Carolina, Sioux County in Iowa, Cleveland in Tennessee, or Loudoun under its special-exception process, and we offer the Standard’s community section as the basis for the conditions of approval. The site follows.

If you sit on a planning commission in a county like these, talk to us before the application. Nothing is hidden and nothing is signed under seal.